Last week, PCU Colorado was at sea again for her third major trial, INSURV trial. During this period, the Navy’s Board of Inspection and Survey evaluates the material readiness of the submarine for the purpose of determining the quality of construction, compliance with specifications and Navy requirements, and to determine if builder responsible equipment is operating satisfactorily. Correcting some minor issues, Colorado was “delivered” to the Navy this morning, September 21st. This means that the construction period is complete and the Navy considers the ship operational. The boat will enter a shakedown phase for the next several months and then reenter the shipyard for a Post Shakedown Availability where any material issues that arise during shakedown will be repaired.
We are hoping in the near future to get more pictures of the boat on sea trials to post.